About removal of intensive inspection of a meter device becoming disused

Concentration inspection of a meter device becoming disused decides to remove in Water Works Bureau by turning into method that member of inspection of a meter reads indication level of water meter that inspection of a meter method was set up by each house with eyes directly to avoid that unexpected accidents occur by leaving unattended.
We contact from Water Works Bureau to building manager and, about intensive inspection of a meter device removal construction, will carry out after adjustment such as schedules later.
In addition, with this construction, we may not hang nuisance (water outage) for use of water supply of customer.
In addition, in conjunction with this construction, as for doing demands such as money or sale of apparatuses, there are none entirely.

One construction situation

Standard construction contents of intensive inspection of a meter device removal construction

  1. Cutting disposal of power supply cables for intensive inspection of a meter device
  2. Board of intensive inspection of a meter device and box body removal
  3. Repair (installation of acrylic board) of box body removal trace of intensive inspection of a meter device
  4. Removal of cable of the meter room of each house and terminal BOX
    ※About cables wired in wall of building, we retain.

Inquiry about water supply to Water Works Bureau customer Service Center

Water Works Bureau customer Service Center

Telephone: 045-847-6262 fax: 045-848-4281
※You run, and please be careful not to make any mistake

Inquiry to this page

Water Works Bureau water supply Service Department water supply maintenance section

Telephone: 045-671-3069

Telephone: 045-671-3069

Fax: 045-212-1167

E-Mail address [email protected]

Return to the previous page

Page ID: 572-206-567

We come back to the top