71.Subsequent findings report (6 during construction) which affects line direct to Sotetsu, Tokyu

Last update date March 25, 2020

Subsequent findings report (6 during construction)

As for line follow-up findings report (6 during construction) direct to Sotetsu, Tokyu, please see the following PDF files.
In addition, sentence, photograph, figure in PDF file becomes a target of copyright.
We cannot make reproduction, conversion without permission unless it was recognized in Copyright Act including "reproduction for private use" and "quotation".

The main story

  • Plan contents of Chapter 1 object business
    • 1.1 The location of name of company, full name of representative and main office
    • 1.2 Name of target business
    • 1.3 Type, scale of target business
    • 1.4 Target business operation area
    • 1.5 Summary of target business
    • 1.6 Enforcer of subsequent investigation and trustee
  • As a result of Chapter 2 follow-up investigation
    • 2.1 Item of subsequent investigation that we listed with subsequent investigation plan and technique
    • 2.2 Implementation period, effective time of subsequent investigation
    • 2.3 Summaries such as results of subsequent investigation
    • 2.4 As a result of subsequent investigation
      • 2.4.1 Subsidence
      • 2.4.2 Water level of groundwater
      • 2.4.3 By-product accompanied with construction
      • 2.4.4 State of implementation (the subsequent subjects of survey item outside) of measures for environmental conservation
    • 2.5 Consideration of subsequent findings
      • 2.5.1 Subsidence
      • 2.5.2 Water level of groundwater
      • 2.5.3 By-product accompanied with construction
    • 2.6 When take measures for environmental conservation newly, as a result of as a result of measures, prediction, evaluation or subsequent investigation
      • 2.6.1 Subsidence
      • 2.6.2 Water level of groundwater
  • The correspondence situation for opinion submitted to by Chapter 3 environmental assessment procedure

Remarks

  • Map used in PDF file got approval of Manager of Geographical Survey Institute and reproduced electronic topographical map 25000 of the hospital issuance. (approval number flat 28 feeling double No. 689)
  • When third party further reproduces, you must get approval of the head of Geographical Survey Institute.

About the procedure situation

About the procedure for this business situation "71 please see Sotetsu, Tokyu direct line environmental assessment procedure".

Adobe Acrobat Reader DC (old Adobe Reader) is necessary to open file of Portable Document Format.
Person who does not have can download free of charge from Adobe company.
Get Adobe Acrobat Reader DCTo downloading of Adobe Acrobat Reader DC

Inquiry to this page

Environmental Planning Bureau policy coordination department environmental assessment section

Telephone: 045-671-2495

Telephone: 045-671-2495

Fax: 045-663-7831

E-Mail address [email protected]

Return to the previous page

Page ID: 916-417-227

We come back to the top