It is the top of this page

The asbestos (asbestos)-containing blowing materials measures situation of Yokohama-shi community building

Last update date May 27, 2020

About measures of asbestos-containing blowing materials of public building, we perform fact-finding in 2005 and use of asbestos-containing blowing materials confine the removal basically about facility which became clear by 2009 and finishes necessary measures such as enclosure. (including facility where main use except three kinds became clear by addition investigation (explanatory note 1) of 2007)
We carry in principle out the quantity of floating measurement by fact-finding for the time being about "facility which encloses, and is in a state" (explanatory note 2), facility considered to be "facility which does not need measures for the time being" (explanatory note 3) in the year and perform maintenance appropriately and decide to carry out measures at the time of facility repair in total.
In addition, after fact-finding of 2005, we carry out similar measures about facility where use of asbestos became clear by repair work.
You can see quantity of latest floating result of a measurement in these facilities from link of Name of the facility.

Facility (at end of March, 2020) which encloses, and is in a state
Facility jurisdiction ward, stationThe location wardName of the facility
(we click Name of the facility to quantity of floating result of a measurement)
Room namesThe blowing situation
Tsuzuki Ward   General Affairs DivisionTsuzukiTsuzuki Ward   synthesis government building

The training room, passage

In the ceiling
Aoba Ward General Affairs DivisionGreen leavesAoba Ward synthesis government buildingOffice (on the first to the fourth floor)In the ceiling
Health and Social Welfare Bureau area support sectionMediumThe healthy welfare synthesis centerParking lot roadwayIn the ceiling
Port and Harbor Bureau General Affairs DivisionMediumSangyo Boeki Cebter Bldg. buildingOffice on the fifth floorIn the ceiling
Port and Harbor Bureau distribution administration sectionMediumHonmoku-Futo LFS customs shedThe first floor, office on the second floorIn the ceiling

Road and Highway Bureau Yokohama beltway adjustment section
Port and Harbor Bureau maintenance promotion section

TsurumiSkywalkLoungesThe back of in the ceiling, the wall
Economic Affairs Bureau administration adjustment sectionKanazawaYokohama NambushijoFlower ridge officeIn the ceiling
Facility (at end of March, 2020) which does not need measures for the time being
Facility jurisdiction ward, stationThe location wardName of the facility
(we click Name of the facility to quantity of floating result of a measurement)
Room namesThe blowing situation
International Affairs Bureau International Cooperation DivisionThe westYokohama international collaboration centerMachine roomsExposure (letter of solidification)
Fire Bureau facility sectionTozukaTotsuka fire departmentThe second-floor libraryExposure (letter of solidification)
Environmental Planning Bureau sewer facility management sectionIsogoSouthern water reproduction centerSupply of air ridgeExposure (letter of solidification)
  • Explanatory note 1: As it became clear to have analyzed analysis by main method only for three kinds among asbestos which there was six kinds in some facilities which carried out by fact-finding of 2005, we carried out reanalysis in 2007.
    Main three kinds…Crocidolite, amosite, chrysotile
    Three kinds that we added…toremoraito, lye Chino light, Ann Sophie light
  • Explanatory note 2: Use place is sealed up in in the ceiling and blowing materials are relatively noxious low chrysotile (as for the content almost 5% or less, one amosite 2%), and will carry in principle out the quantity of floating measurement in the year in future and perform maintenance appropriately, and "facility which encloses, and is in a state" is facility carrying out measures at the time of facility repair in total.
  • Explanatory note 3: Cotton-formed, 1% or less and low thing, hazardousness being relatively low chrysotile, blowing materials carry in principle out the quantity of floating measurement by solidification-formed things for the time being in the year, and, in machine rooms without citizen entering, asbestos content included in blowing materials performs maintenance appropriately, and "facility which does not need measures for the time being" is facility carrying out measures at the time of facility repair in total.

Please contact us for your inquiries to each facility jurisdiction ward, station.

Quantity of floating result of a measurement assumes method to publish in homepage of each jurisdiction ward station from 2016.
As for the previous public announcement material, please see past public announcement material.

Past public announcement material

Adobe Acrobat Reader DC (old Adobe Reader) is necessary to open file of Portable Document Format.
Person who does not have can download free of charge from Adobe company.
Get Adobe Acrobat Reader DCTo downloading of Adobe Acrobat Reader DC

Inquiry to this page

Environmental Planning Bureau environment Maintenance Division Environment Administration Division

Telephone: 045-671-2487

Telephone: 045-671-2487

Fax: 045-681-2790

E-Mail address [email protected]

Return to the previous page

Page ID: 644-503-223

We come back to the top