It is the top of this page

We work on railroad crossing safety measures PR

Last update date June 25, 2020

We are pushing forward drastic measures by continuation grade separation business and quick effect measures such as railroad crossing widening positively now to control outbreak such as traffic jam or accident caused by railroad crossing, and to aim at security, reliable town development.
Furthermore, we perform enlightenment activity at railroad crossing safety measures PR event and railroad crossing to have civic understanding and cooperation sequentially on pushing forward safety measures premeditatedly in Yokohama-shi.

Moving picture


2015

Railroad crossing safety measures PR event

The holding date and time: Saturday, November 7, 2015, 8th Sunday 10:00-16:00
Holding place: See Yokohama Station all; passage the first floor of the basement
We gathered questionnaire findings at "railroad crossing safety measures PR event". (PDF: 592KB)

2016

Railroad crossing safety measures PR event

The holding date and time: Saturday, October 15, 2016, 16th Sunday 11:00-16:00
Holding place: See Yokohama Station all; passage the first floor of the basement
We gathered questionnaire findings at "railroad crossing safety measures PR event". (PDF: 395KB)

2017

Railroad crossing safety measures PR event

The holding date and time: Saturday, January 20, 2018, 21st Sunday 11:00-15:00
Holding place: Yokohama Station Yokohama new city building (Sogo Dept. Store (Shin-Toshi Hall)) the second floor of the basement
We gathered questionnaire findings at "railroad crossing safety measures PR event". (PDF: 530KB)

2018

Railroad crossing safety measures PR event

The holding date and time: Saturday, January 26, 2018 11:00-18:00
Holding place: Yokohama Station Yokohama new city building (Sogo Dept. Store (Shin-Toshi Hall)) the second floor of the basement
We gathered questionnaire findings at "railroad crossing safety measures PR event". (PDF: 863KB)

2019

Grade crossing accident prevention enlightenment activity

The holding date and time: Thursday, May 16, 2019 10:00-11:00
Holding place: Furuichi, Tsurumi-ku place railroad crossing
We carried out press release material "grade crossing accident prevention enlightenment activity" (PDF: 878KB)
Enlightenment flyer (PDF: 992KB)

The holding date and time: Friday, July 12, 2019 10:00-11:00
Holding place: 7, Kamihoshikawa, Hodogaya-ku railroad crossing
We carried out press release material "grade crossing accident prevention enlightenment activity" (PDF: 745KB)
Enlightenment flyer (PDF: 665KB)
[conduct report] (PDF: 657KB)

Adobe Acrobat Reader DC (old Adobe Reader) is necessary to open file of Portable Document Format.
Person who does not have can download free of charge from Adobe company.
Get Adobe Acrobat Reader DCTo downloading of Adobe Acrobat Reader DC

Inquiry to this page

Road and Highway Bureau Construction Department construction section (railroad intersection adjustment charge)

Telephone: 045-671-2792

Telephone: 045-671-2792

Fax: 045-663-8993

E-Mail address [email protected]

Return to the previous page

Page ID: 354-310-096

We come back to the top