Page about use of person of consideration facility required
In late years, in river basin of urban area, the inundation damage of underground shopping centers occurs by typhoon or torrential rainfalls. The large-scale inundation damage occurred around Yokohama-sta.-nishiguchi with typhoon No. 22 of 2004 in Yokohama-shi. Flood Control Law was revised for the purpose of reinforcement of local flood control in July, 2013 by participation in planning of a variety of main constituents while weakening of local flood control power by decrease of member of flood defense party advanced, and approach matter which underground shopping centers of (※) in the inundation assumption area evacuated to owners such as tower facility required and large-scale factory and found was prescribed. Therefore, in this section, we introduce about manuals of plan that owner of each facility or managers make. It has this section inflect, and it makes plans such as securing of evacuation early, and it is necessary to comprise for reduction, evasion of the inundation damage.
(※) the inundation assumption area is area where the inundation is assumed when river overflows by the plan rain of river maintenance.
Underground shopping centers | Large-scale factories (only in the facility where had proposal) | |
---|---|---|
Imposition of measures to office | Duty | Effort duty |
Measures contents of office | ・Making of securing of evacuation plan ・Making of prevention of inundation plan ・Conduct of training ・Setting of self-defense flood control organization | ・Making of prevention of inundation plan ・Conduct of training ・Setting of self-defense flood control organization |
Measures that city carries out | Transmission such as flood forecasts | Transmission such as flood forecasts |
Grasp such as weather conditions is difficult, and, in underground shopping centers, there is characteristic such as being more likely to be connected for serious damage about human life in a short time from the surface of the earth at the time of the inundation.
By Flood Control Law, as for names of underground shopping centers and owners of underground shopping centers decided to set the location or the manager, making, report of "prevention of securing of evacuation, inundation plan" and public announcement are required in Yokohama-shi disaster preparedness plan.
It is leaflet about contents of securing of evacuation program planning for owners of underground shopping centers or manager in contents to fix for prevention of securing of evacuation, inundation plan.
It is manual when we make prevention of securing of evacuation that we gathered up about contents to fix for prevention of securing of evacuation, inundation plan, inundation plan. You make one copy of plan, and please submit to the nearest fire department.
In addition, plan that we made is required to announce by oneself.
It is an example of prevention of securing of evacuation, inundation plan. We provide with Word file. You download, and please use.
When we submit prevention of securing of evacuation, inundation plan, it is necessary style. Please submit to the nearest fire department with plan.
We provide with Excel file. You download, and please use.
Among facilities which do not correspond in underground shopping centers based on the Flood Control Law mentioned above, I would like safety measures in at the time of flood in the facility having basement.
By "securing of evacuation, the inundation prevention plan model" [for notice] which you can write in information or evacuation course figure judging evacuation at, please act for program planning of facility.
In addition, about the plan concerned, we do not need submission to Motoichi.
In late years supply chain was cut apart by the flooding of large-scale river of Thailand which occurred in September, 2011 while the inundation damage occurred frequently by torrential rainfalls, and serious influence amounted to manufacturing industry of our country.
In July, 2013, part of Flood Control Law is revised while we did it this way, and we transmit flood forecasts, and approach of self-defense flood control will be demanded from city as effort duty for owners of facility for (only facility where we reported to by oneself says "large-scale factories".) such as factory, warehouse where constant scales in area (the inundation assumption area) with fear of the inundation are or more.
We link to homepage of the Ministry of Land, Infrastructure, Transport and Tourism.
We transmit flood forecasts to facility where we reported to from city. Please submit to General Affairs Bureau General Affairs Bureau area Disaster Prevention Section.
When we submit prevention of inundation plan, it is necessary style. With plan, please submit to General Affairs Bureau General Affairs Bureau area Disaster Prevention Section.
We provide with Word file. You download, and please use.
→It is PowerPoint material
→Manager of use of person of consideration facility required look at material 1, material 2
・Reference materials (PDF: 1,191KB)
・Model (word: 695KB)
→Manager of underground shopping center facility look at material 3
Adobe Acrobat Reader DC (old Adobe Reader) is necessary to open file of Portable Document Format.
Person who does not have can download free of charge from Adobe company.
To downloading of Adobe Acrobat Reader DC
General Affairs Bureau crisis Management Department area Disaster Prevention Section
Telephone: 045-671-3456
Telephone: 045-671-3456
Fax: 045-641-1677
E-Mail address [email protected]
Page ID: 667-277-627