It is the top of this page

About procedure about building (correspondence to affect emergency declaration)

Last update date January 15, 2021

About correspondence to affect emergency declaration

From the viewpoint of prevention of infection spread of new coronavirus infectious disease, we perform some procedures by mail for the time being.
(things with payment of fee are excluded.)
In addition, we would appreciate your talking with jurisdiction section beforehand.
In addition, we reduce the number of staff coping than usual at window and, for prevention of infection spread of new coronavirus infectious disease, cope.
I would like understanding and cooperation to refrain from non-pivot non-sudden going out for prevention of infection spread sequentially.

As for the person made the next agency, cooperation, please from the viewpoint of prevention of infection spread of new coronavirus about the following points.
 * Please wear mask.
 * I would like cooperation about consultation time at window.
 * When the room is crowded, we would appreciate your coming after taking a pause for a while.

Main duties to perform some procedures by mail

※Please refer to building, development window guidance [Hayami] (PDF: 383KB) for department in charge of each procedure.

Main duties to perform some procedures by mail
Section nameCorrespondence desk workContact informationDetailed page
Housing and Architecture Bureau Planning Division

・Reception desk (use of land general adjustment meeting) of use of land consultation book
※On submission, please let know beforehand.

045-671-3655General adjustment to affect use of land
・Reception desk (land transaction in industrial accumulation area) of land transaction registration form
※On submission, please let know beforehand
Report system before industrial accumulation area large scale land transaction
City Planning Division・Drawing such as restricted zone lines045-671-3510Position confirmation of city planning decision line
・The Town Planning and Zoning Act Article 53 permissionPlanning permission based on Town Planning and Zoning Act Article 53
・The Town Planning and Zoning Act Article 65 permissionPermission based on Town Planning and Zoning Act Article 65
Information consultation section・Report based on guidepost about efficiency format meeting building045-671-2953Efficiency guidepost

・The regulations (prior explanation procedure for middle-high-rise building) about maintenance of living environment affecting buildings such as Yokohama-shi middle-high-rise buildings and development projects
・The regulations (large-scale apartment house) about adjustment of Yokohama-shi development projects

045-671-2350

The middle-high-rise building regulations
Building Planning DivisionReception desk of building energy saving report
※Return does not support.
045-671-4526Each desk work details page
Reception desk of CASBEE Yokohama report
※Return does not support.
・Reception desk of scenic zone regulations permission
※Return does not support.
・Report of act completion, notification of change in scenic zone
Summary of Yokohama-shi scenic zone system
Completion report, slight change of long-term excellent house
※Receptionist of application does not cope.
Each desk work details page
Completion report of low-carbon building
※Receptionist of application does not cope.

Building Guidance Division

・Revision such as replacement of confirmation application book
・Report of completion of use change
・Report of removing
・We change temporary permission of and approve
・Construction supervisor and construction builder election notice
・Contract contract conclusion certificate of construction control duties and construction construction duties
・Name notification of change
・Registration form of slight change procedure
・Submission of report of withdrawal
045-671-4531Each desk work details page
・Structural calculation conformity judgment book (copy)
・Construction plans of preventing the landslide construction (including article which caught confirmation with designated confirmation inspection engine)
・Concrete construction construction plan, stake construction construction debrief report (only as for the article which caught confirmation in Yokohama-shi)
045-671-4536
・It is necessary/required procedures at the time of repair of existing elevator repair045-671-4538
・Periodical reports (including report)

[buildings]
045-671-4539
[elevators]
045-671-4538

Bulletins such as building elevators
・Superannuation building dossier045-671-4539

-

City area Building Control Section

Permission, authorization of relations with sites and road
・Building Standard Act Article 43 permission, authorized prior consultation vote (prior consultation of permission)

[building authorization responsible]
045-671-4510

Permission, authorization of relations with sites and road
Planning permission to be less than the lowest of plottage
・Building authorization prior consultation vote (prior consultation of permission)
Planning permission to be less than the lowest of plottage
Permission based on the Yokohama-shi building standard regulations
※Only in Yokohama-shi building standard regulations Article 4, dojoreisetsudosekikakari
・Building authorization prior consultation vote (prior consultation of permission)
Permission based on the Yokohama-shi building standard regulations
Town development regulations discussion of the welfare
・(change) prior conventional notes such as designated facility setting
・Construction completion notice
The town development regulations of the welfare
We establish attachment installation duty parking facilities about the Yokohama-shi parking lot regulations (attachment installation duty parking lot) (change) and report
・Exception approval application
・Application such as approval
About the Yokohama-shi parking lot regulations (attachment installation duty parking lot)
Permission, authorization (plottage minimum except setsudo, temporary building) based on Building Standard Act, the Yokohama-shi building standard regulations
・Name notification of change
・Plan change approval application
・Open space accessible to anyone, specific facility administrator (election, change) report
・Open space accessible to anyone temporary use approval applications

[city area charge]
045-671-4525

・City area environmental design system (PDF: 515KB)

・Permission, authorization based on other Building Standard Act
(plottage minimum except setsudo, alley-formed site, temporary building) (PDF: 525KB)

Permission based on the Yokohama-shi building standard regulations・Permission (except relations with site and road) based on the building standard regulations (PDF: 433KB)
Residential land Credit SectionYou see detailed page, and please refer for any unclear points.[Midori Ward, Aoba Ward, Tsuzuki Ward  ]
045-671-4515
[Minami Ward, Hodogaya Ward, Asahi Ward, Izumi Ward, Seya Ward]
045-671-4516
[Konan Ward, Isogo Ward, Kanazawa Ward, Totsuka Ward, Sakae Ward]
045-671-4517
[Tsurumi Ward, Kanagawa Ward, Nishi Ward, Naka Ward, Kohoku Ward]
045-671-4518
About response by reception desk by mail and E-mail of residential land Credit Division (urgent correspondence to affect new coronavirus infectious disease)
Adjustment area sectionYou see detailed page, and please refer for any unclear points.045-671-4521About response by reception desk by mail and E-mail of residential land Credit Division (urgent correspondence to affect new coronavirus infectious disease)

Adobe Acrobat Reader DC (old Adobe Reader) is necessary to open file of Portable Document Format.
Person who does not have can download free of charge from Adobe company.
Get Adobe Acrobat Reader DCTo downloading of Adobe Acrobat Reader DC

Inquiry to this page

The Housing and Architecture Bureau architecture leadership architecture Planning Division

Telephone: 045-671-2933

Telephone: 045-671-2933

Fax: 045-550-3568

E-Mail address [email protected]

Return to the previous page

Page ID: 159-527-549

We come back to the top