It is the top of this page

Authorization (law Article 30) of energy saving performance improvement plan

Last update date July 2, 2020

Page guidance

After having received beforehand technical examination about authorized standard by "examination organization", we apply to Yokohama-shi for standard procedure.
Application flow
≪Examination organization≫
・Registration energy saving judgment engine: Registration building energy consumption performance judgment engine prescribed in the building energy saving method
・Registration house performance evaluation engine: Registration house performance evaluation engine prescribed in law about promotion of securing of quality of house

•Standard processing period (indication before issuing authorized notification after doing certification application)
When we receive identification of conformity of technical proper examination by examination organization30th
When we do not receive identification of conformity of technical proper examination by examination organization120 days

※Instructions that we are certification application of energy saving performance improvement plan

  • It is necessary to do certification application to Yokohama-shi before starting construction of construction.
  • In examination organization, please receive examination about authorized standard of all law Article 30 Paragraph 1.
  • When you offer confirmation application to authorization when you do not receive technical examination beforehand, please refer beforehand.
Certification application point
The City of Yokohama, Housing and Architecture Bureau architecture leadership architecture Planning Division
Address6-50-10, Honcho, Naka-ku, Yokohama-shi the 25th floor of the city hall
Telephone045-671-4526

About authorized standard

You keep all original copy, vice-copy on file in A4 version file, and please submit.

  1. Authorized application (the style 33rd) (word: 40KB)
  2. Proxy (when applicant entrusts others with procedure)
  3. Book (PDF: 181KB) to fix for table of law enforcement regulations Article 23
  4. Book which stipulates that other mayors are necessary
  5. One set of attached book when technical identification of examination conformity of examination organization and identification of conformity were issued

After window reception desk, please pay the amount of predetermined fee with fee payment machine.

About contents for change, procedures are different whether technical examination is necessary again.
Please confirm contents beforehand to examination organization which received technical examination in the case of certification application.

Changes (when technical examination is necessary) of plan such as buildings
Change authorization application The rule style 35th (word: 25KB)
Change application fee of principle, certification application fee become at half price. (less than 100 yen cutting off)
※But it may not become at half price when evaluation method is different from application at first.

When the master of authorized building is changed
Notification of change of the master of authorized buildingSummary No. 3 style (word: 17KB)
Of authorized notification when wish to issue again, please apply for "application for re-issue book of authorized notification" << fee 300 yen >> at the same time.

When building works were completed, you attach, and please submit "construction control report" to "report of construction based on building energy consumption performance improvement plan having been completed" plus, vice-two copies immediately.

Completion report required documents
Report of construction based on building energy consumption performance improvement plan having been completed
※Private seal, please seal with thing which is the same as authorized application
Summary No. 6 style (word: 17KB)
Construction control report 
When perform slight change; the explanation material 
Photographs which the clear statement situation of prevention of conversion can identify when we receive floor area ratio exception 

About procedure to affect certification application, please confirm summary of Yokohama-shi.

Other styles
Slight change pertinence proof application (for building catching compatibility judgment nominashio)Summary No. 2 style (word: 33KB)
torishitatodoke (when we withdraw before authorization)Summary No. 4 style (word: 37KB)
Of canceling plan report; bookSummary No. 5 style (word: 34KB)
Report about new construction of building
(when report was sought from Yokohama-shi)
Summary No. 7 style (word: 37KB)
Application for re-issue book << fee 300 yen of authorized notification≫
※Please attach authorized notification in front at the time of other than loss
Summary No. 11 style (word: 36KB)

Adobe Acrobat Reader DC (old Adobe Reader) is necessary to open file of Portable Document Format.
Person who does not have can download free of charge from Adobe company.
Get Adobe Acrobat Reader DCTo downloading of Adobe Acrobat Reader DC

Inquiry to this page

The Housing and Architecture Bureau architecture leadership architecture Planning Division

Telephone: 045-671-4526

Telephone: 045-671-4526

Fax: 045-550-3513

E-Mail address [email protected]

Return to the previous page

Page ID: 692-697-447

We come back to the top