It is the top of this page

About the first floor of the ward office ceiling repair work

Last update date May 18, 2020

Following the fact that ceiling falling off of building occurred in the Great East Japan Earthquake, we carry out ceiling repair work of Aoba Ward the first floor of the government office hall for ensuring safety
It became thing. In addition, the first-floor east side doorway becomes blockade with construction. In addition, we cannot use escalator.
I apologize to for the inconvenience by sound and smell during construction, but would like one of understanding and cooperation as I will carry out safety measures thoroughly.

[construction schedule] From June 1, 2020 to the end of March, 2021 (plan)
※It is plan at the present and may be changed in future.


 

Inquiry to this page

Aoba Ward General Affairs Department General Affairs Division

Telephone: 045-978-2214

Telephone: 045-978-2214

Fax: 045-978-2410

E-Mail address [email protected]

Return to the previous page

Page ID: 255-742-255

We come back to the top